Factory Rebuild Program

CDK FACTORY REBUILD PROGRAM FOR M1022-A1 DOLLY SETS

– Systems Fielded in “As-New” Condition

CDK Mobile Systems has instituted a factory rebuild program for M1022-A1 dolly sets to take old systems from the field and convert them to an “As-New” condition. CDK can take in a customer’s equipment for rebuild, or can supply customers with completely rebuilt systems from CDK’s rotating stock.

As part of the rebuild program the entire dolly set is disassembled, then all structural components are sand blasted and re-painted to the original CARC spec. All air lines, hydraulic lines, electric cables, air bags and hardware are replaced with new parts. Tires are replaced as necessary – but all split rim wheels (and associated tires) are replaced as a safety precaution.

All dolly sets have the Position Tube Reinforcement Modification (US Army MWO 9-2330-390-35-1) applied to bring them to the latest production standard. All other parts are inspected and replaced as necessary.

When complete, the rebuilt systems look and act like factory new equipment. In fact the rebuilt M1022-A1 Dolly Sets carry the same 1-year factory warranty as new systems.

Various military customers have fielded CDK Factory Rebuilt systems over the past 2 years at a substantial savings over the cost of brand new equipment.